River & Channel Maintenance

Clearing 120,000 m³ of compacted alluvial silt, sand, and organic debris accumulation from a 4-kilometer stretch of a vital agricultural shipping channel in the Mekong Delta to restore safe draft for grain barges and prevent seasonal monsoon flooding.

Mekong
Phillipon

The waterway featured dense mats of intertwined water hyacinths and organic roots mixed with heavy river silt, which constantly choked standard pump intakes. The shallow, winding tributaries also made it impossible to bring in heavy, self-propelled trailing suction hopper dredgers without blocking local commercial river traffic.

We supplied a modular, excavator-mounted Amoshydro® Hydraulic Submersible Slurry Pump for River & Channel Maintenance operated from a shallow-draft utility barge. The pump was outfitted with a serrated-edge mechanical agitator designed to chop up organic roots and stringy debris on contact, converting the heterogeneous mixture into a smooth, uniform slurry.

Dredge Pump 9 400×300
Dredge Pump 1 400×300
Hydrualic Dredge Pump With Side Cutter (2)
  • Uninterrupted Organic Clearance: The serrated cutting agitator completely eliminated weed-wrapping and intake choking, maintaining a steady output of 150 m³/hour.
  • Minimal Traffic Disruption: The compact barge setup allowed small-scale operation that left half the channel open for local fishing and transport boats at all times.
  • Flood Mitigation: Successfully restored the flow capacity of the waterway, preventing seasonal overflow into adjacent rice paddies.

related products

size range/dimensions:
2" (50mm) thru 16" (400 mm)
temperature range:
Standard Design: 104°F, Options to 176°F
capacity:
Up to 10,000 GPM (2,275 m3/hr)
get a quote >>

other cases

Indonesia Indonesia
The project focused on a 12-kilometer shallow section of the Solo River basin, where seasonal monsoon flooding had caused severe siltation. The accumulated sediment reduced river capacity and posed high flood risks to surrounding urban areas. The scope required dredging approximately 150,000 m³ of compacted mud, silt, fine sand, and small gravel to restore the natural waterway depth.
Indonesia Indonesia
Located within a complex industrial excavation site in Indonesia, this project is centered on critical waterway maintenance and heavy slurry management. The working environment presents significant geographical challenges, characterized by uneven rocky terrain, soft marshy banks, and expansive settling ponds filled with dense, sediment-heavy water.
United Arab Emirates (Dubai) United Arab Emirates (Dubai)
An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.
Queensland, Australia Queensland, Australia
Ongoing reclamation of consolidated gold and copper tailings from an active tailings storage facility for hydraulic re-processing at the mine's main mill. The scope involved the precise reclamation of approximately 100,000 m³ of material per year. The project utilized a customized long-reach excavator operating on the TSF surface, fitted with the Amoshydro® pump to feed a re-pulping system at a consistent pulp density of 55% solids by weight.
Peru Peru
Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.
Singapore Singapore
Removal of approximately 250,000 m³ of consolidated, fine black marine silt from two critical ultra-large container vessel berths. The project required reaching a specified maintenance depth of -16.0 meters below chart datum. The scope included continuous 24/7 pumping operations over a 6-month period, delivering the high-density slurry to a disposal area via an 800m+ floating and submerged pipeline system with a target discharge density of 1.25 t/m³.