Industrial Sludge & Sewage Cleanout

Industry
Industrial Sludge & Sewage Cleanout
Location
Sweden
Application
Municipal Wastewater Treatment & Environmental Sanitation

Systematic removal and dewatering preparation of 50,000 m³ of heavy, stabilized biological sludge, organic solids, and chemical precipitation residues accumulated over twelve years inside municipal secondary settling basins.

Bg080
Bg067

Biological sludge in municipal treatment lagoons contains high concentrations of stringy polymers and sticky extracellular polymeric substances that bind water tightly, making it notoriously difficult to pump without priming loss. Pumping equipment also had to adhere to strict European Union low-noise standards due to the facility’s proximity to residential districts.

We deployed an acoustically insulated Amoshydro® Hydraulic Slurry Pump System featuring an open-vane impeller and a low-speed macerating agitator. The hydraulic power pack was housed inside a sound-dampening enclosure, keeping operational noise levels below 60 dB(A) at 15 meters.

Excavator Mounted Submersible Mud Pump Application
Dredge Pump 5 400×300

Quiet Urban Operation: Successfully cleaned the lagoons right next to residential neighborhoods without a single noise complaint.

Shear-Resistant Pumping: Handled sticky biological sludge smoothly without gas-locking or losing suction prime.

Plant Capacity Restoration: Restored full hydraulic retention time to the secondary settling basins, instantly improving overall effluent discharge quality.

related products

size range/dimensions:
2" (50mm) thru 16" (400 mm)
temperature range:
Standard Design: 104°F, Options to 176°F
capacity:
Up to 10,000 GPM (2,275 m3/hr)
get a quote >>
size range/dimensions:
2" (50mm) thru 16" (400 mm)
temperature range:
Standard Design: 104°F, Options to 176°F
capacity:
Up to 10,000 GPM (2,275 m3/hr)
get a quote >>

other cases

Indonesia Indonesia
The project focused on a 12-kilometer shallow section of the Solo River basin, where seasonal monsoon flooding had caused severe siltation. The accumulated sediment reduced river capacity and posed high flood risks to surrounding urban areas. The scope required dredging approximately 150,000 m³ of compacted mud, silt, fine sand, and small gravel to restore the natural waterway depth.
Indonesia Indonesia
Located within a complex industrial excavation site in Indonesia, this project is centered on critical waterway maintenance and heavy slurry management. The working environment presents significant geographical challenges, characterized by uneven rocky terrain, soft marshy banks, and expansive settling ponds filled with dense, sediment-heavy water.
United Arab Emirates (Dubai) United Arab Emirates (Dubai)
An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.
Queensland, Australia Queensland, Australia
Ongoing reclamation of consolidated gold and copper tailings from an active tailings storage facility for hydraulic re-processing at the mine's main mill. The scope involved the precise reclamation of approximately 100,000 m³ of material per year. The project utilized a customized long-reach excavator operating on the TSF surface, fitted with the Amoshydro® pump to feed a re-pulping system at a consistent pulp density of 55% solids by weight.
Peru Peru
Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.
Singapore Singapore
Removal of approximately 250,000 m³ of consolidated, fine black marine silt from two critical ultra-large container vessel berths. The project required reaching a specified maintenance depth of -16.0 meters below chart datum. The scope included continuous 24/7 pumping operations over a 6-month period, delivering the high-density slurry to a disposal area via an 800m+ floating and submerged pipeline system with a target discharge density of 1.25 t/m³.