Hydroelectric Reservoir Conservation

Industry
Renewable Energy / Hydroelectric Power Generation
Location
Peru
Application
Mantaro Hydroelectric Complex Reservoir De-silting

Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.

Peru Project (3)
Peru Project (1)

This critical high-altitude reservoir was suffering from severe sedimentation, reducing its active water storage capacity by over 35%. The sediment, consisting of fine mountain silt and glacier melt material, was rapidly encroaching on the power intake structure. Due to steep terrain and remote location, access for large conventional dredging vessels was impossible. Power generation cannot be interrupted.

A unique approach was required. We provided three modular Amoshydro® Hydraulic Submersible Slurry Pumps (HTU-T200-17) designed for shallow-water operation and powered by efficient, excavator-integrated hydraulic systems. The excavators operated from modified flat-top barges. To handle variable sediment density without clogging, we employed specialized hydraulic side cutters that pre-condition the material before pumping. Slurry was transported 600m uphill to a settlement pond.

Amoshydro®hydraulic Submersible Slurry Pump Working Onsite (1)
Excavator working in the river gravel quarry against the background of the forest. Extraction of natural resources.
Lifting Crane On The Deck Of A Pipe Laying Barge.

Storage Recovery: Successfully removed 400,000 m³ of sediment, recovering 15% of total storage capacity in the first phase.

Zero Downtime: Plant operation was maintained at 100% capacity throughout the project; the compact dredging operation did not affect intake flow.

Modular Advantage: Easy assembly and mobilization saved over 50% on project startup costs versus assembling a traditional dredger on-site.

related products

size range/dimensions:
2" (50mm) to 16" (400 mm)
Capacity:
100-2000m3/h
Head:
10-60m
Excavator :
13-360Tons
get a quote >>
size range/dimensions:
2" (50mm) to16" (400 mm)
capacity:
100-2000 m3/hr
Head:
10-60m
Max. concentration:
70%
get a quote >>

other cases

Indonesia Indonesia
The project focused on a 12-kilometer shallow section of the Solo River basin, where seasonal monsoon flooding had caused severe siltation. The accumulated sediment reduced river capacity and posed high flood risks to surrounding urban areas. The scope required dredging approximately 150,000 m³ of compacted mud, silt, fine sand, and small gravel to restore the natural waterway depth.
Indonesia Indonesia
Located within a complex industrial excavation site in Indonesia, this project is centered on critical waterway maintenance and heavy slurry management. The working environment presents significant geographical challenges, characterized by uneven rocky terrain, soft marshy banks, and expansive settling ponds filled with dense, sediment-heavy water.
United Arab Emirates (Dubai) United Arab Emirates (Dubai)
An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.
Queensland, Australia Queensland, Australia
Ongoing reclamation of consolidated gold and copper tailings from an active tailings storage facility for hydraulic re-processing at the mine's main mill. The scope involved the precise reclamation of approximately 100,000 m³ of material per year. The project utilized a customized long-reach excavator operating on the TSF surface, fitted with the Amoshydro® pump to feed a re-pulping system at a consistent pulp density of 55% solids by weight.
Peru Peru
Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.
Singapore Singapore
Removal of approximately 250,000 m³ of consolidated, fine black marine silt from two critical ultra-large container vessel berths. The project required reaching a specified maintenance depth of -16.0 meters below chart datum. The scope included continuous 24/7 pumping operations over a 6-month period, delivering the high-density slurry to a disposal area via an 800m+ floating and submerged pipeline system with a target discharge density of 1.25 t/m³.
Need a Similar Solution?
Let's Design the Right Pump for Your Project Every slurry pumping application is different. Whether you're handling mining tailings, dredging sediment, industrial sludge, or abrasive slurry, our engineering team can recommend the ideal hydraulic pumping solution based on your working conditions.
Get a Free Consultation →
Download The Product Catalog
Send Us a Message