Port of Brisbane Berth Pocket Maintenance Dredging
Removal of 85,000 m³ of soft marine mud, sand, and wharf-side organic waste that had accumulated tightly around concrete pile caps and fender lines inside active container vessel berths.


Customer Challenges
Dredging directly beneath and around active wharf structures is hazardous. Standard large cutter suction dredgers risk striking expensive marine piles, and conventional shore-based cranes cannot reach underneath the concrete overhang of the pier deck. Furthermore, port operations could not be halted for maintenance.
Our Solutions
An Amoshydro® Hydraulic Dredging Pump was suspended via an articulated long-reach crane from a specialized multi-cat service vessel. The pump’s low-profile housing and agile hydraulic sling configuration allowed operators to maneuver safely between closely spaced vertical concrete piles without structural contact.


Key Results & Benefits Delivered
Precision Under-Pier Access: The compact vertical configuration slipped easily between wharf piles to clean dead zones inaccessible to traditional dredgers.
Zero Berth Downtime: Dredging was executed concurrently between ship docking schedules, avoiding multi-million dollar port shutdown losses.
Environmental Safety: Controlled low-turbulence suction prevented the resuspension of legacy industrial nutrients into the open harbor basin.