An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.

Bg106
Gold Mining

Aggressive Abrasion & Large Solids: The geology of the West African placer deposits meant the slurry was heavily laden with highly abrasive silica sand, sharp-edged gravel, and fragmented boulders. The presence of rocks up to 8 inches (200mm) in diameter caused severe damage to standard pumps and required labor-intensive pre-screening.

High-Density, Clog-Prone Slurries: The tailing ponds contained thick, viscous mixtures with up to 70% solid content by weight. Heavy clay and organic matter mixed into the sand frequently jammed conventional enclosed impellers, leading to unacceptable downtime.

Remote, Off-Grid Operations: The mining site was located in a rugged, isolated terrain with absolutely no access to a reliable electrical grid. Conventional high-voltage electric submersible pumps were entirely unviable.

Intensive Wear and Tear: The continuous exposure to sharp-edged solids meant the site’s previous equipment suffered from rapid degradation, with impellers and wear liners failing after just a few hundred hours of operation.

Heavy-Duty Hydraulic / Diesel Integration: We deployed specialized Amoshydro® Hydraulic Sand Dredger Pumps, powered by dedicated, heavy-duty diesel-driven hydraulic power units (utilizing robust CAT®/Cummins® compatible engines). This provided reliable, high-torque power perfectly suited for the remote, off-grid terrain.

Unrestricted Solids Passage: The pumps were configured with a specialized open-vane, anti-clogging impeller and volute design capable of safely passing uncrushed rocks and boulders up to 8 inches in diameter. This completely eliminated the need for upstream pre-screening equipment.

Advanced Metallurgy for Abrasion: To combat the high-silica sand, all wet-end components (impellers, volutes, and adjustable wear liners) were cast from high-chrome alloys. We integrated a dual-seal protection system (combining mechanical seals with gland packing) to prevent leakage during deep submerged operations.

Optimized Hydraulic Design: The internal pump geometry utilized 3D-modeled impellers designed to minimize turbulence and maximize energy transfer, specifically engineered for moving high-concentration slurries (0.5mm–200mm particle sizes) over long discharge lines.

Hydraulic Submersible Sludgy Pump
Bg015

Continuous High-Volume Transport: The Amoshydro system successfully maintained a steady transport rate of 1,500 to 5,000 m³/hour of heavy mud and sand mixtures over the required 2km distance to the separation plant.

Elimination of Pre-Screening Bottlenecks: By easily accommodating 8-inch rocks without flow interruption, the dredging workflow was significantly accelerated, ending the delays associated with jammed intakes and manual rock clearing.

Exceptional Wear Life: The high-chrome components drastically outperformed industry averages in the harsh Cameroon environment. The Amoshydro impellers consistently lasted 1,200–1,500 hours, while the adjustable wear liners exceeded 2,000 hours of service life, representing a 2x to 3x lifespan increase over the customer’s previous equipment.

20% Efficiency Gain: The combination of the optimized hydraulic design and the elimination of clogging incidents resulted in a 20% overall increase in operational efficiency, maximizing the sand recovery rate while stabilizing diesel fuel consumption

related products

size range/dimensions:
2" (50mm) to 16" (400 mm)
Capacity:
100-2000m3/h
Head:
10-60m
Excavator :
13-360Tons
get a quote >>

other cases

Indonesia Indonesia
The project focused on a 12-kilometer shallow section of the Solo River basin, where seasonal monsoon flooding had caused severe siltation. The accumulated sediment reduced river capacity and posed high flood risks to surrounding urban areas. The scope required dredging approximately 150,000 m³ of compacted mud, silt, fine sand, and small gravel to restore the natural waterway depth.
Indonesia Indonesia
Located within a complex industrial excavation site in Indonesia, this project is centered on critical waterway maintenance and heavy slurry management. The working environment presents significant geographical challenges, characterized by uneven rocky terrain, soft marshy banks, and expansive settling ponds filled with dense, sediment-heavy water.
United Arab Emirates (Dubai) United Arab Emirates (Dubai)
An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.
Queensland, Australia Queensland, Australia
Ongoing reclamation of consolidated gold and copper tailings from an active tailings storage facility for hydraulic re-processing at the mine's main mill. The scope involved the precise reclamation of approximately 100,000 m³ of material per year. The project utilized a customized long-reach excavator operating on the TSF surface, fitted with the Amoshydro® pump to feed a re-pulping system at a consistent pulp density of 55% solids by weight.
Peru Peru
Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.
Singapore Singapore
Removal of approximately 250,000 m³ of consolidated, fine black marine silt from two critical ultra-large container vessel berths. The project required reaching a specified maintenance depth of -16.0 meters below chart datum. The scope included continuous 24/7 pumping operations over a 6-month period, delivering the high-density slurry to a disposal area via an 800m+ floating and submerged pipeline system with a target discharge density of 1.25 t/m³.