Excavator Slurry Pump Attachments

Industry
Open-Pit Copper Mining & Tailings Management
Location
Chile
Application
Excavator Slurry Pump Attachments

Rapid-deployment cleanup and transfer of 95,000 m³ of highly abrasive copper tailings sediment settling in remote perimeter collection sumps across a high-altitude mountain mining complex.

Copper Mining
Bg032

The mine site operated at an altitude of over 3,800 meters, where reduced atmospheric oxygen severely penalized standard diesel engine cooling efficiency and centrifugal pump suction performance. Sites were scattered across vast distances, requiring an ultra-portable pumping solution that could be moved rapidly between different sumps.

We provided an Amoshydro® Excavator-Mounted Slurry Pump Attachment designed to pin directly onto the boom of the mine’s existing heavy excavator fleet (Komatsu PC400). Driven directly by the excavator’s auxiliary high-pressure hydraulic circuit, the unit required no independent prime mover or complex electrical cabling.

Hydraulic Submersible Slurry Pump (1)
Hydraulic Submersible Slurry Pump (7)

Plug-and-Play Mobility: The excavator operator picked up and relocated the pump between isolated mine sumps in minutes rather than hours.

High-Altitude Resilience: Hydraulic drive performance remained completely unaffected by high-altitude thin air, unlike standard standalone diesel pumps.

Extreme Wear Resistance: High-chrome wet-end components easily withstood the sharp, highly abrasive copper tailing particles.

related products

size range/dimensions:
2" (50mm) to 16" (400 mm)
temperature range:
Standard Design: 0-60℃
capacity:
Up to 10,000 GPM (2,275 m3/hr)
Excavator :
13-360Tons
get a quote >>
size range/dimensions:
2" (50mm) thru 16" (400 mm)
temperature range:
Standard Design: 104°F, Options to 176°F
capacity:
Up to 10,000 GPM (2,275 m3/hr)
get a quote >>

other cases

Indonesia Indonesia
The project focused on a 12-kilometer shallow section of the Solo River basin, where seasonal monsoon flooding had caused severe siltation. The accumulated sediment reduced river capacity and posed high flood risks to surrounding urban areas. The scope required dredging approximately 150,000 m³ of compacted mud, silt, fine sand, and small gravel to restore the natural waterway depth.
Indonesia Indonesia
Located within a complex industrial excavation site in Indonesia, this project is centered on critical waterway maintenance and heavy slurry management. The working environment presents significant geographical challenges, characterized by uneven rocky terrain, soft marshy banks, and expansive settling ponds filled with dense, sediment-heavy water.
United Arab Emirates (Dubai) United Arab Emirates (Dubai)
An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.
Queensland, Australia Queensland, Australia
Ongoing reclamation of consolidated gold and copper tailings from an active tailings storage facility for hydraulic re-processing at the mine's main mill. The scope involved the precise reclamation of approximately 100,000 m³ of material per year. The project utilized a customized long-reach excavator operating on the TSF surface, fitted with the Amoshydro® pump to feed a re-pulping system at a consistent pulp density of 55% solids by weight.
Peru Peru
Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.
Singapore Singapore
Removal of approximately 250,000 m³ of consolidated, fine black marine silt from two critical ultra-large container vessel berths. The project required reaching a specified maintenance depth of -16.0 meters below chart datum. The scope included continuous 24/7 pumping operations over a 6-month period, delivering the high-density slurry to a disposal area via an 800m+ floating and submerged pipeline system with a target discharge density of 1.25 t/m³.
Need a Similar Solution?
Let's Design the Right Pump for Your Project Every slurry pumping application is different. Whether you're handling mining tailings, dredging sediment, industrial sludge, or abrasive slurry, our engineering team can recommend the ideal hydraulic pumping solution based on your working conditions.
Get a Free Consultation →
Download The Product Catalog
Send Us a Message