Capital Dredging & Marina Cleaning

Industry
Capital Dredging & Marina Cleaning
Location
Greece
Application
Tourism & Coastal Real Estate
Equipment

Capital dredging to deepen the entrance channel and primary maneuvering basins of a private luxury yacht marina. The project required removing 45,000 m³ of compacted sand, silt, and shallow marine debris to increase water depth from 2.0 meters to 4.0 meters.

Bg006
Excavator Mounted Desilting Pump (1)

The marina is located in a confined cove where maneuvering space for traditional cutter suction dredgers was extremely limited. The seabed contained patches of hard-packed sand that resisted standard suction. Furthermore, the project had to be completed during the off-season with zero disruption to marina operations and surrounding waterfront businesses.

We provided a compact, modular Amoshydro® Hydraulic Dredging Pump mounted on a small, highly maneuverable workboat. The pump was equipped with a mechanical cutting agitator to break up the hard-packed sand. The dredged material was pumped through a 500-meter floating pipeline directly to a vacuum truck waiting on a nearby road, which then transported it to an approved disposal site.

Excavator Mounted Desilting Pump (5)
Bg003

EHigh Maneuverability: The compact boat-mounted system worked effectively within the tight confines of the marina without blocking other vessels.

Hard Material Excavation: The cutting agitator easily broke through the hard-packed sand, ensuring the required depth was achieved.

Zero Disruption: The unique pipeline-to-truck transfer method allowed for clean, dust-free operations in a high-end resort environment.

related products

other cases

Indonesia Indonesia
The project focused on a 12-kilometer shallow section of the Solo River basin, where seasonal monsoon flooding had caused severe siltation. The accumulated sediment reduced river capacity and posed high flood risks to surrounding urban areas. The scope required dredging approximately 150,000 m³ of compacted mud, silt, fine sand, and small gravel to restore the natural waterway depth.
Indonesia Indonesia
Located within a complex industrial excavation site in Indonesia, this project is centered on critical waterway maintenance and heavy slurry management. The working environment presents significant geographical challenges, characterized by uneven rocky terrain, soft marshy banks, and expansive settling ponds filled with dense, sediment-heavy water.
United Arab Emirates (Dubai) United Arab Emirates (Dubai)
An active gold mining operation in the mineral-rich East Region of Cameroon required a massive overhaul of its tailing sand recovery process. The project focused on reclaiming legacy tailing ponds and dredging active alluvial sites to extract remaining gold deposits. The scope required a heavy-duty pumping system capable of transporting dense, abrasive sand, gravel, and mud mixtures over a distance of up to 2 kilometers to the central gold separation dredger, all within a rugged, off-grid environment.
Queensland, Australia Queensland, Australia
Ongoing reclamation of consolidated gold and copper tailings from an active tailings storage facility for hydraulic re-processing at the mine's main mill. The scope involved the precise reclamation of approximately 100,000 m³ of material per year. The project utilized a customized long-reach excavator operating on the TSF surface, fitted with the Amoshydro® pump to feed a re-pulping system at a consistent pulp density of 55% solids by weight.
Peru Peru
Implementation of Phase 1 of a major de-silting program to recover reservoir storage capacity. The scope focused on the removal of 400,000 m³ of ultra-fine glacial silt from critical operational zones, specifically near the powerhouse water intakes. The project utilized modular dredging units operated from custom barges in water depths ranging from 5 to 15 meters. Dredged material was pumped uphill via a specialized 600m pipeline to a designated upland settlement basin, requiring dynamic head management.
Singapore Singapore
Removal of approximately 250,000 m³ of consolidated, fine black marine silt from two critical ultra-large container vessel berths. The project required reaching a specified maintenance depth of -16.0 meters below chart datum. The scope included continuous 24/7 pumping operations over a 6-month period, delivering the high-density slurry to a disposal area via an 800m+ floating and submerged pipeline system with a target discharge density of 1.25 t/m³.